Final | 12/4/2017 | 12/5/2017 | 12/5/2017 | A | PASS |
James Ady
|
|
|
Please Call Logan ###-#### to let you in to the house for the Final inspection. Phone #: ###-#### Inspection requested via web by Paula Gietzen Corrections made final ok
|
Final | 12/4/2017 | 12/5/2017 | 12/4/2017 | A | CANC |
James Ady
|
|
|
Final Solar Phone #: ###-#### >> Inspection requested via web by Paula Gietzen Inspection cancelled from web by: Paula Gietzen
|
Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | FAIL |
James Ady
|
|
|
Final on Solar Please call Joey at ###-#### to get in Phone #: ###-#### Inspection requested via web by Paula Gietzen 348.30A Flexable metal conduit shall be securred within 12in of box and every 4 1/2 Ft. 690.31. PV system DC conduits shall be labelled within 3ft of box and every 10 feet.
|
Final | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | CANC |
Eric Story
|
|
|
Solar Final Late afternoon 11/30/17 Phone #: ###-#### Inspection requested via web by Paula Gietzen Re-schedule
|
Final | 10/30/2017 | 10/31/2017 | 10/31/2017 | P | NR |
James Ady
|
|
|
Final Solar Array Phone #: ###-#### Inspection requested via web by Paula Gietzen not ready
|