Final | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by William Salts...job complete...reference rough-in notes...ok to final
|
Electrical Rough-In | 11/13/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by William Salts...UL listed fixtures were verified at another location...previous Stinker station done on Franklin road...contractor has been notified that future jobs need rough inspections and has stated that all fixtures were of the same make and model
|