Information based on query as of Saturday, July 13, 2024.
Permit Information
Permit NumberELE17-03442
StatusFinaled
Name MOUNTAIN POWER ELECT
Site Address 2770 S VISTA AVE
Project Name 
Customer Number17-024
ePlanReviewNo
Description
New: providing the electrical work associated with the ICCU Vista Project. This a ground up building.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final8/16/20188/16/20188/16/2018PPASS
DetailsEric Story
Phone #: ###-#### Inspection requested via web by Jeremy Cloud
Card signed..... Final ok
Final8/6/20188/6/20188/6/2018PPART
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Jeremy Cloud
110.16- Arc flash labels shall be installed.
314.25- Covers shall be installed on all boxes. 1 fire riser room, one 3 gang one 4 gang level 1 electrical rm, and up bath switch.
110.3- Complete up stairs furniture installation.. Signed TCO.
Final8/2/20188/3/20188/3/2018PCANC
DetailsEric Story
Phone #: ###-#### >> Inspection requested via web by Jeremy Cloud Inspection cancelled from web by: Jeremy Cloud
Electrical Rough-In7/24/20187/24/20187/24/2018PPASS
DetailsEric Story
Inspect 2nd floor ceiling for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud
2nd floor ceilings ok to cover
Electrical Rough-In7/10/20187/11/20187/11/2018PPASS
DetailsEric Story
Inspect first floor grid ceilings for cover. Phone #: ###-#### Inspection requested via web by Jeremy Cloud
1st floor suspended ceilings ok to cover
Electrical Rough-In7/3/20187/3/20187/3/2018PPASS
DetailsEric Story
Inspect underground site piping on north side of building for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud
u/g ok to cover
Permanent Service6/29/20187/2/20187/2/2018PPASS
DetailsEric Story
Inspect new service to energize Phone #: ###-#### Inspection requested via web by Jeremy Cloud
Highest value given is 20818 and frame of breaker is 65K rated
p/s u/g n ok
Electrical Rough-In7/2/20187/2/20187/2/2018PPASS
DetailsEric Story
Inspect drive through canopy and underground piping on south side of building for cover Phone #: ###-#### Inspection requested via web by Jeremy Cloud
Canopy and u/g ok to cover
Electrical Rough-In7/2/20187/2/20187/2/2018PCANC
DetailsEric Story
Inspect drive through canopy for cover Phone #: ###-#### >> Inspection requested via web by Jeremy Cloud Inspection cancelled from web by: Jeremy Cloud
Electrical Rough-In6/26/20186/27/20186/27/2018APASS
DetailsRock A. Hudson
Need to inspect hard lid above NW stairwell for cover. Phone #: ###-#### Inspection requested via web by Jeremy Cloud
Area noted rough in ok cover
Electrical Rough-In6/18/20186/18/20186/18/2018PPASS
DetailsEric Story
Mark Phone #: ###-####
2nd floor soffits and bath walls ok to cover
Electrical Rough-In6/7/20186/8/20186/8/2018APART
DetailsEric Story
Mark Phone #: ###-####
2nd floor raised floor and west offices as well as south offices walls only ok to cover
Electrical Rough-In5/29/20185/30/20185/30/2018APASS
DetailsEric Story
Mark Phone #: ###-####
N stair soffit on 1st floor and 2nd floor shaft wall and 2nd floor east stair ceiling ok to cover
Electrical Rough-In5/2/20185/3/20185/3/2018PPASS
DetailsEric Story
1st fl ceiling - Mark Phone #: ###-####
1st floor hard lids and soffit ok to cover
Electrical Rough-In4/30/20185/1/20185/1/2018APASS
DetailsEric Story
2nd fl walls - Mark Phone #: ###-####
2nd floor walls only ok to cover
Electrical Rough-In4/5/20184/6/20184/6/2018APASS
DetailsEric Story
Mark Phone #: ###-####
Entry walls and drive thru walls ok to cover
Electrical Rough-In4/2/20184/3/20184/3/2018PPASS
DetailsEric Story
Mark Phone #: ###-####
Walls on 1st floor and 2nd floor parapet receptacles ok to cover
Electrical Rough-In2/8/20182/9/20182/9/2018APASS
DetailsEric Story
Treon Phone #: ###-####
U/G for sign ok to cover(only at the concreted block at this time)
Electrical Rough-In1/4/20181/4/20181/4/2018PPASS
DetailsEric Story
Underground - Treon Phone #: ###-####
U/G for drive thru area ok to cover
Electrical Rough-In12/29/201712/29/201712/29/2017PPASS
DetailsEric Story
underground // treon Phone #: ###-####
u/g for secondary to biuildings ok to cover
Electrical Rough-In12/18/201712/19/201712/19/2017APASS
DetailsEric Story
underground- Treon Phone #: ###-####
Remaining u/g in electrical room ok to cover
Electrical Rough-In12/14/201712/15/201712/15/2017PPASS
DetailsEric Story
UG // Jake Phone #: ###-####
Phase 1 underground ok to cover
Electrical Rough-In10/20/201710/20/201710/20/2017PPASS
DetailsEric Story
Please Call Jason Parke

This is for a Ufer Ground inspection. Phone #: ###-#### Inspection requested via web by Kevin Perez
Concrete encased electrode ok to cover
Electrical Rough-In10/20/201710/20/201710/20/2017ACANC
DetailsEric Story
Please Call Jason Parke

This is for a Ufer Ground inspection Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
Electrical Rough-In10/11/201710/12/201710/12/2017APASS
DetailsDaryl DeGrange
Please call Jason P.

This is for a electrical underground inspection. Phone #: ###-#### Inspection requested via web by Kevin Perez Rough-in ok cover raceways under footings