Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Rock A. Hudson
|
|
|
David Forbes ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Final ok
|
Electrical Rough-In | 11/9/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Rock A. Hudson
|
|
|
David Forbes ###-#### {CEILING} Phone #: ###-#### Inspection requested via web by Samatha Solberg Grid rough in ok cover
|
Electrical Rough-In | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Rock A. Hudson
|
|
|
David Forbes ###-#### Rough Wall enter through inside of the building next to the restrooms on the first floor, the door will be propped open. Phone #: ###-#### Inspection requested via web by Samatha Solberg Bathroom, drinking fountain and entry walls rough in ok cover
|