ELE-Aging Inspection | 7/27/2020 | 7/27/2020 | 7/27/2020 | | PEND |
Daryl DeGrange
|
|
|
This permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If this job is complete, please schedule an final inspection online Thank you!
|
ELE-Aging Inspection | 4/27/2020 | 4/27/2020 | 4/27/2020 | | FAIL |
Daryl DeGrange
|
|
|
Pursuant of contacting aging permit applicants is on hold until required Social Distancing has been removed.
|
ELE-Aging Inspection | 1/27/2020 | 1/27/2020 | 2/4/2020 | | FAIL |
Rock A. Hudson
|
|
|
Waiting on contractor
|
ELE-Aging Inspection | 10/28/2019 | 10/28/2019 | 11/1/2019 | | FAIL |
Rock A. Hudson
|
|
|
Drove by to check if ok to final. 110.24- Available fault current shall be posted with date calculated as noted on permanent service inspection.
|
Permanent Service | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
Eric Story
|
|
|
Call 30 mins ahead -Mitch Phone #: ###-#### Available fault calc will be posted for final p/s o/h rec ok
|
Conference | 10/23/2017 | 10/23/2017 | 10/23/2017 | P | DONE |
Rock A. Hudson
|
|
|
Mitch Phone #: ###-#### 4-05-32 Code violations not to be retained. 4-05-31(C)- Unfused conductors shall not enter a building unless considered outside building as defined in NEC 230.6. NEC 230.70- A service disconnecting means shall be provided for each service, 1 single phase and 1 3 phase with high leg enters through roof and terminates in panel boards on interior of building. Required labels and high leg marking.
|