Final | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
James Ady
|
|
|
Wiring for the new garage and bonus room above, the (2) failed items have been repaired and is ready for a final inspection, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren final ok
|
Final | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | FAIL |
Eric Story
|
|
|
Wiring for a garage with bonus room addition, any questions plz let us know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren No access and need a person with us if any rooms are occupied by anyone porch outlet not trimmed out
|
Electrical Rough-In | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PASS |
Eric Story
|
|
|
Any issues plz let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Detached garage and upper storage/bonus room ok to cover.
|