Final | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | PASS |
James Ady
|
|
|
final final ok
|
Final | 11/15/2017 | 11/15/2017 | 11/15/2017 | P | CANC |
James Ady
|
|
|
|
Electrical Rough-In | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PASS |
James Ady
|
|
|
Call Bryce 1 hour ahead of time Phone #: ###-#### Inspection requested via web by Christian Kilpatrick Solar disc rough in only ok
|
Permanent Service | 11/7/2017 | 11/7/2017 | 11/7/2017 | P | PASS |
James Ady
|
|
|
Call Bryce 1 hour ahead of time Phone #: ###-#### Inspection requested via web by Christian Kilpatrick 250.53G Grounding electrode shall be driven flush with or below ground level. Shall be done before final. p/s u/g rec ok
|