ELE-Aging Inspection | 8/12/2020 | 8/12/2020 | 8/12/2020 | | PASS |
Daryl DeGrange
|
|
|
see DOC-Final
|
DOC - Permit Expired | 8/12/2020 | 8/12/2020 | 8/12/2020 | P | PASS |
Daryl DeGrange
|
|
|
Electrical work never done by contractor, DOC Final ok
|
ELE-Aging Inspection | 5/13/2020 | 5/13/2020 | 5/13/2020 | | DONE |
Mark Moncarr
|
|
|
Doc-expired. City shut project down because sewer was needing to be re-routed, it was never done.
|
DOC - Permit Expired | 5/13/2020 | 5/13/2020 | 5/13/2020 | A | DONE |
Mark Moncarr
|
|
|
I have had conversations with contractor about job. Work was never done at this address due to city shutting it down because of re-routing sewer.
|
ELE-Aging Inspection | 2/11/2020 | 2/11/2020 | 2/12/2020 | | DONE |
Mark Moncarr
|
|
|
Doc-expire. No work was done at this address as per Lee Electric
|
DOC - Permit Expired | 2/12/2020 | 2/12/2020 | 2/12/2020 | A | DONE |
Mark Moncarr
|
|
|
Talked to Lee Electric, no work was done at this address. Convert garage to living space was not approved due to issues with re-routing sewer to structure.
|
ELE-Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 | | DONE |
Mark Moncarr
|
|
|
Talked to contractor. Job was never done due to city shutting it down because of sewer issues.
|
Final | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | DONE |
Mark Moncarr
|
|
|
Talked to contractor. This job was never done. Evidently job was shut down by the city due to some sewer issues.
|
Conference | 10/31/2017 | 10/31/2017 | 10/31/2017 | P | DONE |
Mark Moncarr
|
|
|
Spoke with Brent about project. We discussed making previous electrical work safe, and that any wall that is open needs to be brought up to code.
|
Conference | 10/30/2017 | 10/31/2017 | 10/31/2017 | A | CANC |
Eric Story
|
|
|
request 10 am // Brent Phone #: ###-#### Needed a pm inspection, rescheduled for afternoon conference
|