Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
James Ady
|
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg final ok
|
Final | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | PART |
James Ady
|
|
|
Just an inspection for temporary occupancy. Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Construction areas have been partitioned off. No electrical has been checked. Partial final is to occupy existing areas only.
|
Final | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | NR |
James Ady
|
|
|
Corbin ###-####
Final for temporary occupancy Phone #: ###-#### Inspection requested via web by Samatha Solberg
|
Conference | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | DONE |
James Ady
|
|
|
Corbin ###-####
Final for temporary occupancy Phone #: ###-#### Inspection requested via web by Samatha Solberg. Discussed putting up a partition wall to sepparate construction areas before temp final.
|
Electrical Rough-In | 11/1/2017 | 11/1/2017 | 11/1/2017 | P | PASS |
Rock A. Hudson
|
|
|
David Joseph ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Wall rough in ok cover
|
Electrical Rough-In | 10/31/2017 | 11/1/2017 | 11/1/2017 | A | FAIL |
James Ady
|
|
|
David Joseph ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg 300.4D Cables and raceways shall not be secured within 1 1/4in away from framing member face, 404.2C Switches controlling lighting loads shall have Grounded conductor.
|