Final | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Ok final.
|
Electrical Rough-In | 2/28/2018 | 2/28/2018 | 2/28/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover. Disc to be on NW side of garage.
|
Permanent Service | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Mark Moncarr
|
|
|
Tom Phone #: ###-#### p/s o/h n ok. Overhead mast was lowered as per IDP. No conflicts with windows above. Weatherhead looks to be atleast 3' away.
|
Electrical Rough-In | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Mark Moncarr
|
|
|
Inspection requested via web by Kevin Perez Ok cover basement.
|
Permanent Service | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
James Ady
|
|
|
Perm. Service Phone #: ###-#### Inspection requested via web by Kevin Perez p/s o/h n ok
|
Electrical Rough-In | 11/15/2017 | 11/16/2017 | 11/16/2017 | A | PASS |
Mark Moncarr
|
|
|
Ok cover. Whole house remodel
|
Electrical Rough-In | 11/13/2017 | 11/15/2017 | 11/15/2017 | P | CANC |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Perez
|