Final | 11/16/2017 | 11/17/2017 | 11/17/2017 | A | PASS |
Mark Moncarr
|
|
|
Seals are poured. Phone #: ###-#### Inspection requested via web by Paul White Ok final. Compound used for sealoffs. 3 conduits used to re-feed 3 turbines for fuel dispensers. Remainder of conduits capped off for future use.
|
Electrical Rough-In | 11/10/2017 | 11/13/2017 | 11/13/2017 | A | PASS |
Mark Moncarr
|
|
|
Completed connection to turbine pump sumps. Phone #: ###-#### Inspection requested via web by Paul White Ok cover remainder of ground work for turbines.
|
Electrical Rough-In | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Mark Moncarr
|
|
|
Stubbing Rigid conduit out of building Phone #: ###-#### Inspection requested via web by Paul White Ok cover. 9 runs of 3/4" rigid cond. to re-feed turbanes and sump pumps off N side of building. Conduits switch to PVC once entering the 24"-30" depth. All sealoffs installed to code.
|