Final | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PASS |
James Ady
|
|
|
Caz Lawler Phone #: ###-#### Corrections made final ok
|
Final | 10/22/2018 | 10/23/2018 | 10/23/2018 | P | FAIL |
James Ady
|
|
|
Anne Phone #: ###-#### 210.8 All kitchen counter receps shall be GFCI protected. (Left of sink and behind coffee maker)
|
Electrical Rough-In | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | PASS |
James Ady
|
|
|
Kitchen rough in Kaz Phone #: ###-#### Corrections made kitchen, Pantry only ok to cover
|
Electrical Rough-In | 1/16/2018 | 1/18/2018 | 1/18/2018 | A | FAIL |
James Ady
|
|
|
after 9:30 please // Kaz Phone #: ###-#### Grounding conductors shall be continuous. (pig tail all grounds and tuck wires inside boxes)
|
Conference | 11/27/2017 | 11/29/2017 | 11/29/2017 | P | DONE |
James Ady
|
|
|
Please call ahead for access, 20min - Anne Phone #: ###-#### Talked about kitchen recep spacing, Circuit requirments, Wire size, and when to call for inspection.
|