Final | 3/16/2018 | 3/19/2018 | 3/19/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Dan Surerus Ok final.
|
Electrical Rough-In | 1/8/2018 | 1/9/2018 | 1/9/2018 | A | PASS |
Mark Moncarr
|
|
|
This is a request for a rough-in on the 2 basement bedrooms and the stairwell Phone #: ###-#### Inspection requested via web by Dan Surerus Ok cover stairwell and 2 down beds.
|
Electrical Rough-In | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Mark Moncarr
|
|
|
This is a request for a cover inspection on the kitchen, bedroom, bathroom and living room. Phone #: ###-#### Inspection requested via web by Dan Surerus Ok cover. Outlet upstairs to right of slider will be added on final.
|
Electrical Rough-In | 11/19/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Mark Moncarr
|
|
|
Partial rough-in inspection request. Phone #: ###-#### Inspection requested via web by Dan Surerus Ok cover front wall entry and ceiling. Up mstr bed/bath and garage except panel wall.
|