Final | 8/22/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
Mark Moncarr
|
|
|
Garage code 0111 enter Phone #: ###-#### Inspection requested via web by Robert Schroder Ok final.
|
Final | 8/13/2018 | 8/13/2018 | 8/13/2018 | P | CANC |
Mark Moncarr
|
|
|
finale on structure only, power for rear gate not complete Phone #: ###-#### >> Inspection requested via web by Robert Schroder Inspection cancelled from web by: Robert Schroder
|
Electrical Rough-In | 8/10/2018 | 8/10/2018 | 8/10/2018 | A | PASS |
Mark Moncarr
|
|
|
Please inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover.
|
Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Mark Moncarr
|
|
|
Please inspect floor heat for cover, 3 bathrooms on second floor. Thank You!! Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover floor heat 3 baths up.
|
Rough-In Permanent Service | 4/29/2018 | 4/30/2018 | 4/30/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Schroder Rough in ok cover p/s u/g n ok
|
Electrical Rough-In | 12/4/2017 | 12/5/2017 | 12/5/2017 | P | PASS |
Mark Moncarr
|
|
|
Please inspect 1" and 3/4" schedule 40 conduit for cover, unit will be slab on grade. Thank You!! Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover 4 stub up locations.
|
Electrical Rough-In | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Mark Moncarr
|
|
|
inspect underground conduit for cover Phone #: ###-#### Inspection requested via web by Robert Schroder Ok cover trench for low volt. Trench is atleast 30"
|