Final | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | PASS |
Mark Moncarr
|
|
|
This Ia All Ready For A Final And Cieling Is Done Lock Box Code Is 4209. Please Call With Any Questions Or Concrns Thanks So Much Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Ok final.
|
Electrical Rough-In | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | PASS |
Mark Moncarr
|
|
|
This Is A Wall Inspection For Cover Only Ill Have The Ceiling Done Next Week.The Space Is Unoccupied And The Lock Box Code Is 4290. Please Call With Any Questions Or Concerns Thanks And Have A Happy Thanksgiving! Dave ###-#### Phone #: ###-#### Inspection requested via web by jason shifflett Ok cover. Conference room is 216 sq ft. 210.71(B)(2) states if it is over 215 it has to have floor outlet. With this small difference in floor space I will not require a floor outlet to be installed due to extensive cost for concrete work. Number of outlets required meets 210.52(A)(2).
|