Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Rock A. Hudson
|
|
|
Correction have been made as noted Phone #: ###-#### Inspection requested via web by Steve Craig Final ok
|
Final | 2/25/2018 | 2/26/2018 | 2/26/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig BCC 4-05-23 It shall be unlawful to cover any wiring or equipment prior to inspection. Kitchen grid installed prior to inspection. Kitchen appliances installed no access to devices. 210.8- All GFCI devices shall be located in a readily accessible location. 210.8(B)- All kitchen receptacles shall have GFCI protection, 1 pole and multi pole receptacles. 300.15- All wiring shall terminate in a box. Sign conduits, above north door, mezz wiring in floor. open box in basement, above grid.
|
Electrical Rough-In | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | PASS |
Rock A. Hudson
|
|
|
Cover inspection for new framed walls and existing wall opened to install electrical Phone #: ###-#### Inspection requested via web by Steve Craig Main level wall rough in ok cover
|
Conference | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | DONE |
Rock A. Hudson
|
|
|
Consultation request Phone #: ###-#### Inspection requested via web by Steve Craig Discussed the required spacing for showroom window receptacles. Asked if maximum space for required receptacles could be increased to mount on columns. 210.62 states max spacing shall not exceed 12'. Shall not exceed 12' spacing between receptacles.
|
Conference | 11/30/2017 | 11/30/2017 | 11/30/2017 | P | DONE |
Rock A. Hudson
|
|
|
Call 1 hour prior to confirm Phone #: ###-#### Inspection requested via web by Steve Craig Discussed if boxes permitted above decorative drop partial ceiling. Wood panels will be small and removeable, box access ok above. Also showroom window receptacles may be few inches over 18" due to structural steel beam. OK. Asked about required emergency and egress lighting informed all depends on occupancy load and to check with life/safety inspector.
|