Final | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Mark Moncarr
|
|
|
Please call Tina (homeowner) ###-#### when you are enroute. Please call Luke at ###-#### if you have any questions on the install. Thank You. Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final. Kitchen hood has a single pole switch as a disconnect.
|
Electrical Rough-In | 2/6/2018 | 2/7/2018 | 2/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Please Tina Smith on your way. ###-#### If you have any questions please call Aaron ###-#### Phone #: ###-#### Inspection requested via web by Clay Morgan Talked to Clay and let him know that RI inspection was already covered and painted. I could not inspect walls. Ultra Clean Restoration was the had there employees insulate and sheetrock before electrical inspec. Ultra Clean was eventually fired by homeowner. Platinum Restoration was new company hired.
|
Electrical Rough-In | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | NH |
Mark Moncarr
|
|
|
The homeowner will be there and late morning works best for her. If you have any questions, please call Aaron at ###-####. Thank You! Phone #: ###-#### Inspection requested via web by Clay Morgan Arrived at 12:10 and knocked 2 seperate times. There was a vehicle on street in front of house, and 1 in the driveway. I left and came back at 1:30 and knocked again. No answer.
|