ELE-Aging Inspection | 7/28/2020 | 7/28/2020 | 7/28/2020 | | PEND |
Daryl DeGrange
|
|
|
This permit is still open with the City of Boise. Please call 208 ###-#### with progress report or any questions. If this job is complete, please schedule an final inspection online Thank you!
|
ELE-Aging Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | | FAIL |
Daryl DeGrange
|
|
|
Pursuant of contacting aging permit applicants is on hold until required Social Distancing has been removed.
|
ELE-Aging Inspection | 1/28/2020 | 1/28/2020 | 2/5/2020 | | DONE |
James Ady
|
|
|
Waitng for owner to schedule final.
|
Final | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | NR |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lonnie Purvis call for final after service is energized
|
Permanent Service | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lonnie Purvis p/s u/g n ok
|
Final | 5/14/2018 | 5/17/2018 | 5/17/2018 | A | FAIL |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Lonnie Purvis Install service riser and slip joint. Remove nonlisted pvc fittings from Grounding electrode Conductor PVC Sleeve.Set screw on Intersystem bond connector.
|