Final | 1/2/2018 | 1/2/2018 | 1/2/2018 | P | PASS |
Eric Story
|
|
|
Call if you have questions // Kevin Phone #: ###-#### Final ok
|
Conference | 12/28/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Eric Story
|
|
|
Kevin Phone #: ###-#### Discussed being able to energize remote panel proir to inspection, Told him it was ok to being the main has already been inspected and will call for a final once idaho power has removed meter.
|
Permanent Service | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Eric Story
|
|
|
Kevin Phone #: ###-#### p/s o/h rec ok
|