Final | 2/3/2018 | 2/6/2018 | 2/6/2018 | P | PASS |
Eric Story
|
|
|
final for LED flat panels Phone #: ###-#### Inspection requested via web by Tim Dunlop Final ok
|
Electrical Rough-In | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Eric Story
|
|
|
we should be there at 830am Rough in for our led flat panels Phone #: ###-#### Inspection requested via web by Tim Dunlop Verified U/L listing of 2x2 replacement fixtures through out for replacement of fixtures.
|