Final | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Tom Saunders
|
|
|
call ###-#### for access Phone #: ###-#### Inspection requested via web by David Nelson...corrections made...ok to final
|
Final | 2/7/2018 | 2/8/2018 | 2/8/2018 | A | FAIL |
Tom Saunders
|
|
|
access key is on the North rock formation to the right of the doors on a red rock at eye level, call ###-#### Phone #: ###-#### Inspection requested via web by David Nelson.. 1.outlet within 6' of sink shall have GFCI protectrion 2. OCPD on A/C is too large 3. A/C shall be labelled for identification 4. plates need installed on switch and outlets inside hearing booth...light covers installed 5. service outlet for A/Cs has no power..check GFCI protection
|
Rough-In Permanent Service | 12/18/2017 | 12/19/2017 | 12/19/2017 | A | PASS |
Tom Saunders
|
|
|
Unit should be open by 9:00 by general contractor. Phone #: ###-#### Inspection requested via web by David Nelson...p/s u/g new ok...rough in ok to cover
|
Permanent Service | 12/14/2017 | 12/15/2017 | 12/15/2017 | A | FAIL |
Eric Story
|
|
|
Service inspection so service can be re-energized. Unit should be open by 9:00 by general contractor. Phone #: ###-#### Inspection requested via web by David Nelson 110.24 AFC calculation required proir to service being energized. Need to verify main bonding jumper in main service gear no access inside to see it
|