Final | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Final ok
|
Final | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson 1. Lockout for hood. 2. A/C max fuse is 35. 40a brkr installed, and 60a fuses at A/C. 3. GFI b;y back french doors not tamper resist. 4. Disconnect needed for furnace. Not within sight. 5. P-8 style filler plate needed for WP on garage.
|
Electrical Rough-In | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Under ground not in at time of inspection, Will create P/S, contractor to provide minimum clearance above garage roof as per 230.24. Swing may cross over peak of roof, may be issue. House and garage rough in ok cover
|
Permanent Service | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wilson Shall provide clearance for overhead service entrance conductors as per 230.24. May cross garage roof peak may be issue called contractor to inform. p/s o/h n ok
|