Final | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Tom Saunders
|
|
|
We are requesting a final inspection at this location. This is a Jacuzzi power install. we will not be on site because the work is complete. i will notify the home owner, Lisa Lopez ###-####. The residence has an open yard, so access to the right rear of the home is open. P.O.C. Larry ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney.. job complete...ok to final
|
Electrical Rough-In | 12/14/2017 | 12/14/2017 | 12/14/2017 | A | PASS |
Tom Saunders
|
|
|
We are requesting a final inspection at this location. This is a Jacuzzi power install. we will not be on site because the work is complete. i will notify the home owner, Lisa Lopez ###-####. The residence has an open yard, so access to the right rear of the home is open. P.O.C. Larry ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney... 50A circuit ran from exterior all-in-one, sch80 pvc, to disconnect with GFI installed
|