Final | 3/22/2018 | 3/23/2018 | 3/23/2018 | P | PASS |
James Ady
|
|
|
Final inspection for apron lighting. Contact Jon Novak 1/2 hour before inspection so he can meet you there. Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
Electrical Rough-In | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Eric Story
|
|
|
Pole base inspection (underground ) Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Pole bases ok to cover
|
Electrical Rough-In | 2/22/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Daryl DeGrange
|
|
|
Underground Rough-in Contact Jon Novak Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Ok cover trench East side of Tarmac between pole bases.
|
Electrical Rough-In | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
James Ady
|
|
|
Underground Inspection Contact Jon Novak Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Underground from sky west building to pad and along South end of pad only ok to cover
|