Final | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Mark Moncarr
|
|
|
Ellana (HOMEOWNER) Phone #: ###-#### Ok final. Corrections made.
|
Final | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by David McClellan 1. Up and down baths not GFI protected. Including recept down low under towel bar. 2. Light in up bath over tub needs removed and replaced with 3/0 blank. 3. 2 single pole lockouts needed for D/W and hood. 4. Connectors needed on A/C disc. Also disc need labeled A,B or 1,2. Disc on right hand side needs thhn to replace romex in flex and neutrals identified as hot conductors. 5. Couldnt verify GFI protection for floor heat mstr.
|
Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | CANC |
Mark Moncarr
|
|
|
>> Inspection requested via web by David McClellan Inspection cancelled from web by: David McClellan
|
Electrical Rough-In | 4/7/2018 | 4/9/2018 | 4/9/2018 | A | PASS |
Mark Moncarr
|
|
|
Master bath floor heat only Phone #: ###-#### Inspection requested via web by David McClellan Ok cover floor heat master.
|
Electrical Rough-In | 1/20/2018 | 1/22/2018 | 1/22/2018 | A | PASS |
Mark Moncarr
|
|
|
Upstairs rough in. Downstairs was already done. Phone #: ###-#### Inspection requested via web by David McClellan Ok cover upstairs.
|
Electrical Rough-In | 1/17/2018 | 1/17/2018 | 1/17/2018 | A | PASS |
Mark Moncarr
|
|
|
Down stairs rough-in only. Upstairs not ready Phone #: ###-#### Inspection requested via web by David McClellan Ok cover first floor only.
|