Final | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | PASS |
Eric Story
|
|
|
Permit was on hold Eric walked and tested this back in April Contact Chris Trivolis 10 minutes before for access to Apt. Phone #: ###-#### Inspection requested via web by David Feller Final ok
|
Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 | P | PASS |
Eric Story
|
|
|
rough in inspections walls contact Darren Hoff with questions 208.807.5122 Knob and Tube will be disconnect before new circuitry is energized as per walk thru with Eric Phone #: ###-#### Inspection requested via web by David Feller Whole rewire of apartment ok to cover, Knob and tube will be removed once able to turn off power.
|