Final | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Eric Story
|
|
|
Suite 140 workout room and bathroom Phone #: ###-#### Inspection requested via web by steve sellers Final ok. Occ card not on site .
|
Electrical Rough-In | 12/20/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Eric Story
|
|
|
access through front doors then first door on the left, the scope of work is the two smaller rooms not the large open area to the south. Phone #: ###-#### Inspection requested via web by steve sellers New bath and workout area ok to cover, Hard lids in bath only and suspended ceiling in workout room...
|
Electrical Rough-In | 12/19/2017 | 12/20/2017 | 12/20/2017 | A | CANC |
Eric Story
|
|
|
Front entrance first door to right gains access to area, large open area is not in scope Phone #: ###-#### >> Inspection requested via web by steve sellers Inspection cancelled from web by: steve sellers
|