Final | 5/4/2018 | 5/7/2018 | 5/7/2018 | A | PASS |
Mark Moncarr
|
|
|
Kenny Phone #: ###-#### Ok final.
|
Electrical Rough-In | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Mark Moncarr
|
|
|
Call half hour before to meet // Kenny Phone #: ###-#### Ok cover. Talked to electrical contractor via phone. He allowed the floor installers to finish installing the floor heat. Met with contractor on site and acquired literature needed to verify the foam underlayment was listed for floor heating purposes. EasyMat is the manufacturer, and it can be used with floor heating. Explained to contractor that he retains full responsibility for the floor heat installation.
|
Electrical Rough-In | 4/4/2018 | 4/5/2018 | 4/5/2018 | A | FAIL |
Mark Moncarr
|
|
|
cover the floor heat-Kenny Phone #: ###-#### Floor installers were laying floor heat in main area, hall, bed and bath. Called and left message with contractor and stated that he needed to be the one doing the floor heat. Also need to verify foam flooring is rated for floor heat. Need to be 8" away from floor register in bedroom.
|
Electrical Rough-In | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Tom Saunders
|
|
|
Craig Phone #: ###-####...rough ok to cover...heated floor will be inspected later...contractor informed
|
Electrical Rough-In | 12/21/2017 | 12/22/2017 | 12/22/2017 | A | PASS |
Rock A. Hudson
|
|
|
Kenny Phone #: ###-#### Detached garage, upstairs to be unfinished, garage rough in ok cover
|