Final | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Tom Saunders
|
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...see rough notes...job complete...panels existing...disconnect and meter base replaced
|
Permanent Service | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Tom Saunders
|
|
|
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...new 200A meter base installed with 1 new 100A disconnect...meter set and power on...unable to verify wire size...business operational at time of inspection...electrical contractor taking full responsibility for wiring uninspected
|
ELE-Aging Inspection | 3/19/2020 | 3/19/2020 | 3/23/2020 | | DONE |
Daryl DeGrange
|
|
|
Contractor scheduled final inspection for PM 3/23/20
|