Final | 1/31/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton final ok
|
Electrical Rough-In | 1/26/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Existing lighting used. Ceiling only ok to cover
|
Permanent Service | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
James Ady
|
|
|
Please call Shawn with questions. Phone #: ###-#### Inspection requested via web by Kerri Hamilton already had perm serv inspection
|
Permanent Service | 1/18/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
James Ady
|
|
|
Inspect electrical panel installed and wire termination, so Idaho Power can install a meter. Contact is Shawn at ###-####. Phone #: ###-#### Inspection requested via web by Kerri Hamilton
|
Electrical Rough-In | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | CANC |
James Ady
|
|
|
Inspect electrical panel installed and wire termination, so Idaho Power can install a meter. Contact is Shawn at ###-####. Phone #: ###-#### Inspection requested via web by Kerri Hamilton
|
Electrical Rough-In | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Talked to Dustin about damaged service gear behind building. He will address problem before final. Walls and ceiling only MINUS storage/Electrical room. rough in ok
|