Final | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PASS |
Rock A. Hudson
|
|
|
Lynn Phone #: ###-#### Final ok
|
Final | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | FAIL |
Rock A. Hudson
|
|
|
Lynn Phone #: ###-#### 3 floor boxes and 1 wall receptacle in flex room not working. Label panel for relocated and new circuits
|
Electrical Rough-In | 2/15/2018 | 2/16/2018 | 2/16/2018 | A | PASS |
Rock A. Hudson
|
|
|
ceiling grid // Lynn Phone #: ###-#### Level 4 call need key fob for elevator. Grid rough in ok cover
|
Electrical Rough-In | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Eric Story
|
|
|
The ceiling is all grid. We need a wall rough in inspection for insulation and sheetrock. Please call Lynn Proctor ###-#### before inspection. Phone #: ###-#### Inspection requested via web by Lynn Proctor Walls only ok to cover
|