Permit Information
Permit NumberELE18-00120
StatusFinaled
Name ENTERPRISE ELECTRIC
Site Address 6280 N EAGLE RD
Project Name 
Customer NumberC-18001
ePlanReviewNo
Description
Alteration: Lighting upgrade and some TI work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/11/20184/12/20184/12/2018APASS
DetailsTom Saunders
We are requesting a final inspection for this project. Contact is Bobby ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...ok to final
Electrical Rough-In3/30/20183/30/20183/30/2018PPASS
DetailsTom Saunders
Requesting ceiling inspection for the front offices Phone #: ###-#### Inspection requested via web by Clint Tate...ok to cover
Final3/21/20183/22/20183/22/2018ANR
DetailsTom Saunders
We are requesting a final inspection for the dressing room area, walls and ceiling. Contact is Larry Looney ###-#### or on-site is Curtis Burney with ESI, ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...walls are not complete...added rough for ceiling grid of dressing rooms
Electrical Rough-In3/22/20183/22/20183/22/2018APASS
DetailsTom Saunders
Contact is Larry Looney ###-#### or on-site is Curtis Burney with ESI, ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney....ceiling grid for dressing rms ok
Electrical Rough-In3/9/20183/9/20183/9/2018PPASS
DetailsMark Moncarr
We are requesting a wall rough-in inspection for the fitting rooms this afternoon. Our contact is Bobby @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate Ok cover walls.
Electrical Rough-In2/20/20182/20/20182/20/2018PPASS
DetailsTom Saunders
We are requesting another above ceiling inspection for the guest services area. There is a coiled up Fire Alarm wire and device still above the ceiling, we are waiting on a RFI response as to where this is going to be relocated.
Curtis ###-#### will be onsite. Phone #: ###-#### Inspection requested via web by Larry Looney...ok to cover
Electrical Rough-In2/14/20182/15/20182/15/2018AFAIL
DetailsTom Saunders
We are requesting an above ceiling inspection for the Guest Services area of the store. Curtis W/ ESI ###-#### will be on-site. Our contact is Larry ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...
not ready...open junction boxes, LV laying on grid, grid not complete
Electrical Rough-In2/14/20182/14/20182/14/2018PPASS
DetailsRock A. Hudson
We are requesting a wall rough-in inspection for this afternoon for the men''s restroom. Our contact is Bobby ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate
Met Curtis with ESI and he informed me existing ceiling to remain with remodel cans being added and 1 recess flourescent turning 90 degrees.
Mens bathroom wall rough in ok cover
Electrical Rough-In2/2/20182/2/20182/2/2018PPASS
DetailsRock A. Hudson
We are requesting a wall inspection for the Guest Services area of this project.
You will find some MC coiled up high and low and this is for the future cabinets that will be installed along the wall. Curtis is the super for ESI and will be onsite,###-####. Larry w/ Enterprise will be available by phone ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney
Area noted to left of entrance wall rough in ok cover.
Final1/26/20181/26/20181/26/2018PPART
DetailsTom Saunders
We are requesting an inspection for the front offices for a possible temp CO.
Tony will be onsite ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...partial final so can have occupency of new offices and training room
Electrical Rough-In1/25/20181/26/20181/26/2018APASS
DetailsTom Saunders
We are requesting a ceiling inspection for the office grid for tomorrow morning. Our contact is Bobby @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate...corrections for ceiling grid done..ok to cover
Electrical Rough-In1/24/20181/24/20181/24/2018PFAIL
DetailsTom Saunders
We are requesting a ceiling inspection in the beauty area for this afternoon. Our contact is Bobby @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate...
1) open junction boxes above ceiling grid shall be made up and closed properly
2) MC stubs above ceiling grid shall be safed off in boxes and blanked off
3) low votage wiring shall be strapped up off ceiling grid
4) next ceiling grid inspection that fails will result in a reinspection fee...have inspected same area twice already
Electrical Rough-In1/22/20181/22/20181/22/2018PNR
DetailsTom Saunders
We are requesting a above ceiling inspection for the front offices for this afternoon. Our contact is Bobby @ ###-####. Thank you Phone #: ###-#### Inspection requested via web by Clint Tate...not ready
Conference1/18/20181/19/20181/19/2018ADONE
DetailsRock A. Hudson
We would like to have a consultation on the lack of grounding in building.
Curtis with ESI is the Superintendent: ###-####
If you can call Larry w/ Enterprise 30 mins prior to site visit: ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney
Discussed existing wiring of Target store. Contact concerned about the absense of equipment grounding conductors in conduits and the use of multi wire branch circuits through out store. EMT conduits are still an approved method for providing equipment grounding system as per 250.118. Multi wire branch circuits at time building was built had been a popular method of wiring. Due to the increase in electronic lighting and equipment multi wire branch circuits are not used as much today because of the possibility of an over load the grounded conductor. As long as installed as per 210.4 multiwire branch circuits are still use today. All existing wiring can remain as is in building as long as violations are not present and new wiring shall be installed to 2017 version of NEC.
Electrical Rough-In1/10/20181/10/20181/10/2018PPASS
DetailsTom Saunders
we are requesting a rough-in inspection in the front office area of this project.
The owner site rep is also curious if this building has out dated switch gear, if time permits a consultation on the gear would be appreciated.
Contact is Curtis Burnie ###-#### Phone #: ###-#### Inspection requested via web by Larry Looney...wall cover for new offices ok...verified floor outlets from previous discussion with Curtis from ESI ok...consultation on switch gear done-work looks to code, no violations were visible for switch gear, discussed 2 visible code violations on existing lighting that need fixed, all new work shall be to current code and verified at final