Conference | 1/16/2018 | 1/18/2018 | 1/18/2018 | A | DONE |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce...Discussed actions being taken to verify work done by others. Responsibilty of permit holder on work done by others with no permit. New walls, outlets and switches installed, relocating of lighting, and any GFI protection needed.
|
Final | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce...Job is complete...GFI protection verified, multiple outlets checked, and proper labelling...ok to final
|
Electrical Rough-In | 1/18/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Debby Pierce...Walls were sheetrocked without a rough inspection by unknown contractor. Power Plus pulled permit and takes responsibility for work previously done. Verified work by opening outlets in multiple areas to view material used and proper workmanship. Also opened tiles in ceiling to verify work. Ok
|
Conference | 1/16/2018 | 1/17/2018 | 1/16/2018 | A | CANC |
Tom Saunders
|
|
|
Chad VanOrden is contact at ###-####. Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
|