Final | 4/12/2018 | 4/13/2018 | 4/13/2018 | A | PASS |
James Ady
|
|
|
access 5885 Phone #: ###-#### Inspection requested via web by David Nelson final ok
|
Electrical Rough-In | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PASS |
Rock A. Hudson
|
|
|
FLOOR HEAT Inspection only, access 4878 Phone #: ###-#### Inspection requested via web by David Nelson Master bath floor heat rough in ok cover
|
Electrical Rough-In | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | PASS |
James Ady
|
|
|
access 4878 Phone #: ###-#### Inspection requested via web by David Nelson Down kitchen, Pantry, and laundry. Up master closet and Bath. Lighting only. Used exhisting 15amp vanity circuit as receps stayed in same location. rough in ok
|