Final | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Mark Moncarr
|
|
|
Matt ###-#### Ok final. Talked to Matt about installation of heat tape on roof. 20a GFI brkr was used. Hard wire of 2 segments. 1 for the roof portion, and 1 for the gutter that goes to and down the center down spout. Looked at job on 1/23/18.
|
Final | 1/23/2018 | 1/23/2018 | 1/23/2018 | A | CANC |
Mark Moncarr
|
|
|
Re-scheduled for 1/24/18. Want to talk to electrician about install. ###-#### Matt
|
Final | 1/22/2018 | 1/23/2018 | 1/23/2018 | A | CANC |
Mark Moncarr
|
|
|
Office number - listed as not electrician will be on site.- We installed heat tape Phone #: ###-#### Inspection requested via web by Matthew White Re-scheduled for 1/24/18.
|