Final | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PASS |
James Ady
|
|
|
between 9-12 please// Rocky Phone #: ###-#### Master bed and bath Final ok
|
Electrical Rough-In | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Mark Moncarr
|
|
|
radiant floor, before 9 or after 10:30 please - olivia Phone #: ###-#### Ok cover mstr bath floor heat
|
Electrical Rough-In | 1/25/2018 | 1/29/2018 | 1/29/2018 | P | PASS |
James Ady
|
|
|
Early afternoon - Rocky Phone #: ###-#### Up master bed, Bath and Laundry/ Closet only ok to cover. Check for access and covers on J boxes in HVAC chace to left of master vanity
|