Final | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Eric Story
|
|
|
Scott. Call prior to heading to the site. Phone #: ###-#### Inspection requested via web by Sean DeLacy Final ok
|
Electrical Rough-In | 2/2/2018 | 2/2/2018 | 2/2/2018 | P | PASS |
Eric Story
|
|
|
Scott. Wall rough in at East side entrance. Phone #: ###-#### Inspection requested via web by Sean DeLacy Wall only ok to cover
|