Final | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Mark Moncarr
|
|
|
Solar Array ready for Final Inspection Phone #: ###-#### Inspection requested via web by Paula Gietzen Ok final. All labels needed are present.
|
Final | 2/21/2018 | 2/23/2018 | 2/23/2018 | A | CANC |
Mark Moncarr
|
|
|
Solar Array final Phone #: ###-#### Inspection requested via web by Paula Gietzen I will contact electrical contractor to brace overhead mast, and to also install another mast of some sort on W side of garage to achieve 36" requirement for clearance from rooftop.
|
Electrical Rough-In | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Mark Moncarr
|
|
|
Solar Array pre final Phone #: ###-#### Inspection requested via web by Paula Gietzen Ok cover. All items UL listed.
|