Final | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
James Ady
|
|
|
added ground rods, not raising the mast, finaling to complete permit Phone #: ###-#### Inspection requested via web by Don Conley As per Idaho power. Mast height ok. Final ok
|
Conference | 2/8/2018 | 2/8/2018 | 2/8/2018 | P | DONE |
James Ady
|
|
|
Call Troy to meet at State street need to consult on what would be required so the mast can be raised Phone #: ###-#### Inspection requested via web by Don Conley Talked about raising height of mast. Informed Troy ID Power will not connect if weather head is 8ft above roof. Need to contact ID power to verify connect Height. Also need to supply intersystem bond and address any code violations in imediate area of panel.
|