Final | 5/8/2019 | 5/8/2019 | 5/8/2019 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Craig Ok final. Contractor not on site. Talked to him on phone and confirmed that all exterior front lighting works.
|
Electrical Rough-In | 1/7/2019 | 1/8/2019 | 1/8/2019 | A | PASS |
Mark Moncarr
|
|
|
Rough in electrical in new facade to the west side of Rite Aid. Recessed cans, and column lights Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 12 cans soffitt, 5 lights columns.
|
Electrical Rough-In | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Eric Story
|
|
|
Rough in of electrical in soffit of Rite Aid. Phone #: ###-#### Inspection requested via web by Steve Craig Entry soffit cans and column lights ok to cover
|
Electrical Rough-In | 6/19/2018 | 6/19/2018 | 6/19/2018 | P | PASS |
Mark Moncarr
|
|
|
Area F rough in . Over the main entrance to the Goodwill store. Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 6 cans and 3 column lights for Goodwill outside entry.
|
Electrical Rough-In | 6/5/2018 | 6/6/2018 | 6/6/2018 | A | PASS |
Mark Moncarr
|
|
|
Next phase lighting and sign power rough in. All facade near theatre sign Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 18 soffit cans to left of movie theatre, and 5 columns lights.
|
Electrical Rough-In | 4/3/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Mark Moncarr
|
|
|
Inspect recessed cans installed in next soffit area Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 6 soffit cans and 2 column stubs on 2 units joining W side of Rite Aid.
|
Electrical Rough-In | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PASS |
Mark Moncarr
|
|
|
Rough in of next facade section Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 9 soffit cans and 3 column light stubs. Contractor had to stub column lights because the face of columns are being built out with other material. This allows him to set boxes flush with finished surface.
|
Electrical Rough-In | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Mark Moncarr
|
|
|
Call Tod 30 minutes prior to meet on site Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 6 cans in front of hair salon, Idaho Gold, and vapor shop. Another 6 cans in soffit along E side of vapor shop.
|
Electrical Rough-In | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | NH |
Mark Moncarr
|
|
|
Cover inspection for facade remodel. Call STEVE 30 minutes prior to arrange to meet on site Phone #: ###-#### Inspection requested via web by Steve Craig Left message with contact at 10:37, no return call.
|
Electrical Rough-In | 2/13/2018 | 2/14/2018 | 2/14/2018 | A | PASS |
Mark Moncarr
|
|
|
Rough in cover in facade next to Albertsons Phone #: ###-#### Inspection requested via web by Steve Craig Ok cover 9 cans in soffit and 4 columnn lights.
|