Final | 10/15/2018 | 10/19/2018 | 10/19/2018 | A | PASS |
James Ady
|
|
|
Ready for final electrical inspection on basement; anytime Friday is ok, but prefer morning. Phone #: ###-#### Inspection requested via web by Steve Hanchett Basement area only final ok
|
Conference | 8/6/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
James Ady
|
|
|
My permit expires on 8/15/18 - I have all the electrical work done, but won''t have the drywall textured ; painted for a couple more weeks. Not sure how finished the rest of project needs to be for you to do final inspection? Phone #: ###-#### Inspection requested via web by Steve Hanchett Spoke with owner. Needs more time to finish. Will give extension.
|
ELE-Request for Extension | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
James Ady
|
|
|
My permit expires on 8/15/18 - I have all the electrical work done, but won''t have the drywall textured ; painted for a couple more weeks. Not sure how finished the rest of project needs to be for you to do final inspection? Phone #: ###-#### Inspection requested via web by Steve Hanchett Project is 6 weeks from complete. Extension ok
|
Electrical Rough-In | 4/17/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
James Ady
|
|
|
After 1 pm Phone #: ###-#### Inspection requested via web by Steve Hanchett Back area of basement only ok to cover
|
Conference | 3/15/2018 | 3/16/2018 | 3/16/2018 | P | DONE |
James Ady
|
|
|
After 4pm if possible, unless conference is just phone call then anytime is fine Phone #: ###-#### Inspection requested via web by Steve Hanchett Conference was done by phone. Discussed recep spacing in bedroom, AFCI protection, Recep location and ampacity of bath vanity, Wire support, Tamper resistant recep, Smoke detectors. Customer also has a copy of Homeowners hand out.
|