Permit Information
Permit NumberELE18-00849
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 367 N ANCESTOR PL
Project Name 
Customer Number669
ePlanReviewNo
Description
Alteration: Electrical for new manufacturing facility
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/4/201812/7/201812/7/2018APASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...
job complete...ok to final...no card to sign
Final10/17/201810/18/201810/18/2018APART
DetailsTom Saunders
Please call 30 minutes ahead if possible. Bob is our site contact Phone #: ###-#### Inspection requested via web by Graham Estep..
left to inspect: circuit #8, GFI protection for vending, GFI within 6ft sink upstairs QC rm, convur, work tables fed off poles, misc equipment, panel rm-panels, LV rack bond..
temp occupency given
Final10/16/201810/17/201810/17/2018APART
DetailsTom Saunders
Partial Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton...exterior of building minus electrical rm and half of warehouse up to dividing wall...ok
GFI protection need added for outlets in wash rm
Electrical Rough-In10/12/201810/15/201810/15/2018APASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ceiling grid 2 small areas for sprinklers...ok to cover
Electrical Rough-In10/2/201810/3/201810/3/2018APASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Level 1- 2 managers offices and 2 mech. rms, level 2 all grid rough in ok cover
Electrical Rough-In10/1/201810/2/201810/2/2018APART
DetailsRock A. Hudson
Roger ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Roger not contact Bob is @ ###-####
300.4- Cables shall not be installed with in 1 1/2" of corregated roof. S.W offices and corridor.
N.W. offices level 2 grid rough in ok cover.
Electrical Rough-In9/26/20189/26/20189/26/2018PPASS
DetailsJames Ady
please call 30 minutes ahead Phone #: ###-#### Inspection requested via web by Kerri Hamilton Filling, wash and mixing room ceilings only ok to cover
Electrical Rough-In9/18/20189/19/20189/19/2018PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Office areas and corridors 1st floor grid rough in ok cover.
Electrical Rough-In8/27/20188/28/20188/28/2018APASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...remaining East wall...wallcover complete
Permanent Service8/7/20188/7/20188/7/2018PPASS
DetailsTom Saunders
Early afternoon please Phone #: ###-#### Inspection requested via web by Kerri Hamilton...
p/s u/g new ok
Electrical Rough-In8/7/20188/7/20188/7/2018PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...4 bathroom hard lids ok to cover
Conference8/1/20188/1/20188/1/2018APASS
DetailsTom Saunders
discuss plenum walls...met with Brian Scholes and went over what is needed to make walls a plenum and what can be done to seal off electrical outlets and switches in plenum areas
Electrical Rough-In7/31/20187/31/20187/31/2018PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...all walls complete...ok to cover.. wiring in plenum walls have been sealed off as needed for code
Electrical Rough-In7/25/20187/26/20187/26/2018APASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...upstairs walls only ok to cover
Electrical Rough-In7/23/20187/23/20187/23/2018PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...wall cover downstairs minus plenum walls and one side mezzane wall for safety issues
Conference7/17/20187/17/20187/17/2018APASS
DetailsTom Saunders
plenum wall discussion...met with plumbing, hvac, general of job, and electrical foreman and discussed wiring of walls being used as plenum....confusion on prints how walls being used...return or supply of air in manufactureing plant area
Conference7/13/20187/13/20187/13/2018APASS
DetailsTom Saunders
wall discussion...met with Mike Jordan and discussed walls that are rated as "plenum walls"..not marked on plans...made contact with Ryan at EEG (electrical contractor supervisor) which made contact with general and is stopping wall cover on previous approved walls. Electrical wiring has been done vertically and horizontally in walls. Re-engineering of walls may be done to deal with plenum rating.
Electrical Rough-In7/11/20187/12/20187/12/2018PPASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...all walls exterior and interior south of beam..ok to cover
Electrical Rough-In7/2/20187/3/20187/3/2018APASS
DetailsMark Moncarr
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok to one side for panel room, and mechanical. Conduits will be surface mounted.
Electrical Rough-In3/13/20183/14/20183/14/2018APASS
DetailsTom Saunders
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...underground feeds west end ok to cover
Electrical Rough-In3/6/20183/7/20183/7/2018PPASS
DetailsTom Saunders
Upher Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ok to cover