Final | 12/4/2018 | 12/7/2018 | 12/7/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton... job complete...ok to final...no card to sign
|
Final | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PART |
Tom Saunders
|
|
|
Please call 30 minutes ahead if possible. Bob is our site contact Phone #: ###-#### Inspection requested via web by Graham Estep.. left to inspect: circuit #8, GFI protection for vending, GFI within 6ft sink upstairs QC rm, convur, work tables fed off poles, misc equipment, panel rm-panels, LV rack bond.. temp occupency given
|
Final | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
Tom Saunders
|
|
|
Partial Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton...exterior of building minus electrical rm and half of warehouse up to dividing wall...ok GFI protection need added for outlets in wash rm
|
Electrical Rough-In | 10/12/2018 | 10/15/2018 | 10/15/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ceiling grid 2 small areas for sprinklers...ok to cover
|
Electrical Rough-In | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Level 1- 2 managers offices and 2 mech. rms, level 2 all grid rough in ok cover
|
Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PART |
Rock A. Hudson
|
|
|
Roger ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton Roger not contact Bob is @ ###-#### 300.4- Cables shall not be installed with in 1 1/2" of corregated roof. S.W offices and corridor. N.W. offices level 2 grid rough in ok cover.
|
Electrical Rough-In | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
James Ady
|
|
|
please call 30 minutes ahead Phone #: ###-#### Inspection requested via web by Kerri Hamilton Filling, wash and mixing room ceilings only ok to cover
|
Electrical Rough-In | 9/18/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Rock A. Hudson
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Office areas and corridors 1st floor grid rough in ok cover.
|
Electrical Rough-In | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...remaining East wall...wallcover complete
|
Permanent Service | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Tom Saunders
|
|
|
Early afternoon please Phone #: ###-#### Inspection requested via web by Kerri Hamilton... p/s u/g new ok
|
Electrical Rough-In | 8/7/2018 | 8/7/2018 | 8/7/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...4 bathroom hard lids ok to cover
|
Conference | 8/1/2018 | 8/1/2018 | 8/1/2018 | A | PASS |
Tom Saunders
|
|
|
discuss plenum walls...met with Brian Scholes and went over what is needed to make walls a plenum and what can be done to seal off electrical outlets and switches in plenum areas
|
Electrical Rough-In | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...all walls complete...ok to cover.. wiring in plenum walls have been sealed off as needed for code
|
Electrical Rough-In | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...upstairs walls only ok to cover
|
Electrical Rough-In | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...wall cover downstairs minus plenum walls and one side mezzane wall for safety issues
|
Conference | 7/17/2018 | 7/17/2018 | 7/17/2018 | A | PASS |
Tom Saunders
|
|
|
plenum wall discussion...met with plumbing, hvac, general of job, and electrical foreman and discussed wiring of walls being used as plenum....confusion on prints how walls being used...return or supply of air in manufactureing plant area
|
Conference | 7/13/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Tom Saunders
|
|
|
wall discussion...met with Mike Jordan and discussed walls that are rated as "plenum walls"..not marked on plans...made contact with Ryan at EEG (electrical contractor supervisor) which made contact with general and is stopping wall cover on previous approved walls. Electrical wiring has been done vertically and horizontally in walls. Re-engineering of walls may be done to deal with plenum rating.
|
Electrical Rough-In | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...all walls exterior and interior south of beam..ok to cover
|
Electrical Rough-In | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok to one side for panel room, and mechanical. Conduits will be surface mounted.
|
Electrical Rough-In | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | PASS |
Tom Saunders
|
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton...underground feeds west end ok to cover
|
Electrical Rough-In | 3/6/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Tom Saunders
|
|
|
Upher Phone #: ###-#### Inspection requested via web by Kerri Hamilton...ok to cover
|