DOC - Permit Finaled | | | 10/4/2018 | | DONE |
|
|
|
per Chad S-no permit was required for the interior remodel-only that was done did not require a perit-it was all cosmetic. Paint, carpet, kitchen cabinets-final was done and passed on 5/1/18 so was changed back to ISS status by mistake
|
Final | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Eric Story
|
|
|
No one on site. Call with any questions. Phone #: Inspection requested via web by Garrett Collins Final ok
|
Permanent Service | 3/10/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Eric Story
|
|
|
Service at rear of house. Phone #: ###-#### Inspection requested via web by Garrett Collins p/s o/h rec ok
|
Electrical Rough-In | 3/10/2018 | 3/12/2018 | 3/12/2018 | P | PASS |
Eric Story
|
|
|
No one on site. Owner knows your coming. Call with questions. Phone #: ###-#### Inspection requested via web by Garrett Collins Contractor will remove all existing outlets that are in cynder nlock wall, Whole house re-wire ok to cover
|