Final | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | PASS |
James Ady
|
|
|
final inspection for B17C 2nd floor restroom remodel. Phone #: ###-#### Inspection requested via web by Steve Moss Final ok
|
Electrical Rough-In | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
James Ady
|
|
|
Need new wall inspected so the sheet rock can be installed. Phone #: ###-#### Inspection requested via web by Steve Moss ok to cover
|