Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
James Ady
|
|
|
Ben Phone #: ###-#### Final ok
|
Electrical Rough-In | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | PASS |
James Ady
|
|
|
rougin in on add on- Ben Phone #: ###-#### Back room only rough in ok
|
Electrical Rough-In | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PASS |
James Ady
|
|
|
Ben-please do inspection after 9:00 or call Ben-call for access Phone #: ###-#### underground only ok to cover
|