Final | 3/20/2019 | 3/21/2019 | 3/21/2019 | A | PASS |
James Ady
|
|
|
Victor Phone #: ###-#### Final ok
|
Final | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | NR |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Victor Simenc
|
Electrical Rough-In | 4/3/2018 | 4/3/2018 | 4/3/2018 | P | PASS |
James Ady
|
|
|
Phone #: ###-#### Inspection requested via web by Victor Simenc Kitchen, Hall, Main bath, Bed and closet ok to cover
|
Conference | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | DONE |
James Ady
|
|
|
Victor Phone #: ###-#### Covered Kitchen lay out and circuitry, Bath layout and circuitry, AFCI protection on added receps in bedroom, Make up of boxes before rough in, when to call for rough in, wire supports, Nail plates and left a copy of frequently asked code referances with owner.
|