Final | 9/10/2018 | 9/12/2018 | 9/12/2018 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
|
Electrical Rough-In | 5/30/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Mark Moncarr
|
|
|
Swimming pool EQ bonding Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover EQ plane. Plane runs down and around lower catch basin for negative edge pool.
|
Electrical Rough-In | 4/2/2018 | 4/3/2018 | 4/3/2018 | A | PASS |
Mark Moncarr
|
|
|
Swimming pool underground and bonding Phone #: ###-#### Inspection requested via web by Lars Johnson Ok cover grd work. 4 corners bonded on main body of pool. Negative edge portion of pool not usable for seating or anything of the like.
|