Final | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
James Ady
|
|
|
Final office furniture connections Phone #: ###-#### Inspection requested via web by Kevin Perez Final ok
|
Final | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PART |
James Ady
|
|
|
Occupancy final inspection, waiting for office furniture. Phone #: ###-#### Inspection requested via web by Kevin Perez Partial final for furniture set only ok
|
Electrical Rough-In | 4/11/2018 | 4/13/2018 | 4/13/2018 | P | PASS |
James Ady
|
|
|
Contact Tech on site. Luke at number listed above. Ceiling cover inspection Phone #: ###-#### Inspection requested via web by Kevin Perez ceiling only ok to cover
|
Electrical Rough-In | 3/20/2018 | 3/20/2018 | 3/20/2018 | P | PASS |
Rock A. Hudson
|
|
|
Point of contact is Luke at number listed above. Wall rough-in inspection Phone #: ###-#### Inspection requested via web by Kevin Perez 1 conference room with floor receptacle in place and 5 receptacles minimum required also in place. Wall rough in ok cover
|