Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok final kitchen, and down bath.
|
Electrical Rough-In | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Mark Moncarr
|
|
|
Door code 2014. Please call when you are on your way Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok cover kitchen and S side of basement. Kitchen cabinets will go in before short wall is framed. Electrician is waiting for wall to be built so he can add outlets where needed.
|
Permanent Service | 3/28/2018 | 3/28/2018 | 3/28/2018 | P | PASS |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Trevor Soesbe p/s o/h rec ok. Existing water bond there and installed a long with 2 grd rods.
|