Final | 4/26/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Mark Moncarr
|
|
|
Requesting Rough and Final at the Same time since we missed Rough at install. We will have equipment for Rough-In. Contact is Austin Phone #: ###-#### Inspection requested via web by BRS Permitting Ok final.
|
Electrical Rough-In | 4/26/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Mark Moncarr
|
|
|
Requesting Rough and Final at the Same time since we missed Rough at install. Contact is Austin. Phone #: ###-#### Inspection requested via web by BRS Permitting Ok cover. All items UL listed.
|
Final | 4/23/2018 | 4/24/2018 | 4/24/2018 | P | FAIL |
Mark Moncarr
|
|
|
Karrigan Hollins Phone #: ###-#### Inspection requested via web by BRS Permitting Boise City Ordinance requires a rough-in inspection. I have discussed rough in requirements to 4 different installers over a weeks time.
|